Intrusive asbestos surveys before refurbishment, extensions, strip outs and demolition, for homeowners, developers, builders and businesses across Leeds and West Yorkshire.
We'll call you back the same day
🔒 Your details are safe. No spam, ever.
A refurbishment and demolition asbestos survey finds the asbestos that building work is likely to disturb, before anyone starts. Under the Control of Asbestos Regulations 2012 and the HSE survey guide HSG264, this type of survey is needed before refurbishment or demolition of any building built before 2000.
Unlike a management survey, it is fully intrusive. Within the areas where work will happen, the surveyor lifts floor coverings, opens up stud walls and ceilings, breaks into boxing and ducts, and looks inside the building fabric. Demolition surveys cover the whole structure, including roof voids, underfloor spaces and service routes.
The goal is simple: no hidden asbestos for your builders to discover halfway through a job.
A management survey only looks at what is reasonably accessible during normal use. Asbestos boards behind plasterboard, lagging inside a sealed boxing or tiles under a newer floor will often be missed, because the surveyor is not allowed to break into the building fabric.
That is exactly the material your builder will hit with a saw or hammer. Disturbing it releases fibres, puts workers and occupants at risk, and usually means stopping the job, cleaning up under controlled conditions and paying for a licensed contractor at short notice. A refurbishment survey costs a fraction of that.
For larger jobs, the client has a duty under the Construction (Design and Management) Regulations 2015 to provide pre construction information, and asbestos information is a key part of it. Your survey report gives your contractors what they need to plan safely.
You may see a refurbishment and demolition survey called an R&D survey, or by its older name, a Type 3 survey. They all mean the same thing: a fully intrusive and sometimes destructive asbestos survey of the areas where construction work will happen.
The survey is the client's responsibility. If you are paying for the building work, you should arrange the asbestos survey and pass the report to your builder or principal contractor before work starts. Builders should not start work in an older building until they have seen it.
Because a refurbishment and demolition survey has to reach every hidden material in the scope of works, the area usually needs to be vacated and cleared. That is why the survey is normally booked once your plans are settled but before the strip out begins. If the plans change later, any new areas need surveying too.
Why does this matter so much? Asbestos fibres are microscopic. When asbestos containing materials are disturbed, fibres are released into the air, and if you inhale them they can cause mesothelioma, lung cancer and asbestosis, diseases that can take decades to appear. This survey is fully intrusive and destructive by design, because you cannot rely on a non intrusive inspection to find what is hidden inside the building fabric.
The asbestos survey report identifies all asbestos containing materials (ACMs) within the scope, so they can be removed by a licensed contractor or trained team before the builders arrive. For demolition, all asbestos must be removed as far as reasonably practicable before the building comes down.
Agreeing the scope. We start with your plans, drawings or a description of the work, so the survey covers every area that will be affected. A clear scope keeps the cost down and makes sure nothing is missed.
Preparing the building. Because the survey is intrusive, the areas being surveyed should be empty of people and, where possible, furniture. For homes we plan around you; for businesses we can survey in phases.
The inspection. The asbestos surveyor works methodically through each area, sampling suspect materials and recording their extent and condition. Samples are analysed by a UKAS accredited laboratory.
The report. You get a register of every material found within the scope, with locations, quantities, photographs and lab results, ready to hand to your builder or principal contractor.
Any asbestos that will be disturbed by the work should normally be removed before the work starts. Depending on the material, that may be licensed work carried out by an HSE licensed contractor, or non licensed work done by trained operatives.
Licensed work needs notification to the HSE before it starts, so allow time in your programme. Once the work is done, update your asbestos register and asbestos management plan if the building is non domestic, or keep the paperwork safe if it is your home.
We can quote for the removal and plan it around your programme so your builder can start on time. Find out more about our commercial asbestos removal and residential asbestos removal services.
We carry out refurbishment and demolition asbestos surveys throughout Leeds and West Yorkshire, from a single kitchen in Horsforth to mill conversions in Holbeck and strip outs in Leeds city centre. Our asbestos surveyors follow HSG264, and asbestos sampling and testing is done by a UKAS accredited laboratory.
Not sure whether you need a refurbishment survey, a demolition survey or a simple asbestos test? Tell us what the builders will be doing and we will recommend the right type of asbestos survey and give you a fixed price.
If the house was built before 2000 and the refit will disturb walls, ceilings, floors or boxing, yes, a survey of those areas is the safe and recommended way to start. It does not need to cover rooms you are not touching.
A refurbishment survey covers only the areas affected by the planned work. A demolition survey covers the whole building, including the structure, because everything will be disturbed.
You can stay in the house, but the rooms being surveyed should be empty while the surveyor works because the inspection is intrusive.
Yes, to a limited and controlled extent, in areas that are about to be worked on anyway. Openings are made carefully and the surveyor will explain what is needed before starting.
Once samples have been analysed by the lab, the report follows. We give you a clear timescale when we book so you can plan your builder's start date.
It depends on the size of the area in scope, how intrusive the survey needs to be and how many samples are taken. A single room in a house costs far less than a demolition survey of a whole commercial building. We give a fixed price once we have seen your plans or a description of the work.
A competent surveyor who specialises in asbestos, whether the building is commercial or one of the many domestic dwellings built before 2000. The HSE recommends using a surveying organisation accredited by UKAS, with surveyors holding a recognised qualification such as BOHS P402, and samples analysed by a UKAS accredited laboratory. Ask any surveyor about these before you book.
Tell us about the building and the work you have planned. We will recommend the right survey and give you a fixed price, with a same day response.